ABB Turbo Systems LTD. Factory Building
Brugger-/Werkstrasse, 5401 Baden

Principal

ABB Turbo Systems Ltd. / ABB Immobilien AG

Architecture

1996 - 1997
Floor area: 5,300 m²
m³ SIA 116: 50,600 m³

ABB Turbo
Systems LTD. Factory
Building

ABB Turbo
Systems LTD. Factory
Building

Factory Building and Incoming Goods

Subcontractor, trade and industry

The production and assembly hall is between the existing sheds and the service building and is 126 m long, 24 m wide and 13 m high. An important emphasis of the entire building is the 3.50-metre high luminous strip. Thanks to the extremely light post-and-bar construction, the factory roof appears weightless and to float in mid-air. Particular attention was paid to forming a clearly recognisable ensemble with the high-rise built by architect Rohn in 1948. Some years later, the new building for the central incoming goods at ABB Turbo Systems was raised: a high, smooth cube (56 m long, 36 m wide and 17.50 m high) that stands out prominently among the bulky environment of the industrial zone. Its 18 m overhanging canopy, measuring 900 m², is absolutely unmistakeable.

Facts

Principal

ABB Turbo Systems Ltd. / ABB Immobilien AG

Architecture

Ausführung 1996 - 1997
Geschossfläche: 5‘300 m²
m³ SIA 116: 50‘600 m³